Start a conversation

Custom homes, remodels and additions

Colorado homes, built and remodeled to the last joint.

Master Builders of Colorado builds custom homes and takes on the rest of a house's life: remodels, additions, outdoor living, roofing and siding, and repairs. Considered design and exacting craftsmanship, wherever the work is.

Move to shift the light. Scroll to open the joint.Scroll to open the joint.

Project
Your home
Location
Colorado
Builder
Master Builders of Colorado
Sheet
A-000 Cover
Light
from the northwest
Photo
Illustrative image, not a Master Builders of Colorado project.

Background: illustrative, not our project. Nate Johnston / Unsplash

The idea behind the mark

The connection is the signature.

From the curb, most houses look finished. Roof pitch, cladding and window count can all be right on paper. The quality of a home shows up where two things meet: stone against glass, a roof edge against a wall, timber against masonry. That is where water finds its way in, and where care becomes visible.

See six joints up close
Close view of a coursed limestone wall meeting a slim bronze window frame at dusk
  1. 01

    Craft, made visible.

    Joints, transitions and material decisions should hold up to close inspection.

  2. 02

    Authority, without display.

    Plain language and evidence. No superlatives the work cannot back up.

  3. 03

    Place, without cliché.

    Colorado belongs in the setting, the light and natural materials.

Illustrative image, not a Master Builders of Colorado project.

Sheet A-200 / Services

New homes, and everything a home needs after.

Custom homes, remodels, additions, outdoor rooms, the exterior shell and the repairs in between, with the same care at every joint. The work runs along the Front Range from Fort Collins to Colorado Springs, across the Denver metro and every city between.

  1. A new house designed around its site, from soils report to final walkthrough.

    View custom homes
  2. Layout, ventilation, power and storage worked out before a cabinet is ordered.

    View kitchen remodels
  3. Waterproofing, drainage and ventilation done right behind the tile you choose.

    View bathroom remodels
  4. Dry, safe, permitted lower levels, with moisture and radon handled first.

    View basement finishing
  5. Reworking an existing house end to end, including what the walls reveal.

    View whole-home renovation
  6. New space tied into the old structure so it looks and performs like one house.

    View home additions
  7. Decks, covered patios and outdoor rooms built for sun, snow and freeze-thaw.

    View decks and outdoor living
  8. The weather-facing shell of the house, flashed and lapped to shed water and hail.

    View roofing, siding and windows
  9. Smaller fixes and updates, starting with finding the cause, not just the symptom.

    View repairs and renovations

See every service

Illustrative footage, not Master Builders of Colorado projects.

Sheet A-201

Custom home styles to start from.

Most custom homes begin with a picture someone has been saving. Pick the direction closest to yours and bring it to the first conversation.

Illustrative images, not Master Builders of Colorado projects.

Background: illustrative image of a house being framed, not a Master Builders of Colorado project.

Bring the picture you have been saving.

A photo, a sketch or a short list of must-haves is enough to start, whether the project is a new house, a kitchen, an addition or a repair that keeps coming back.

Illustrative image, not a Master Builders of Colorado project.

Sheet A-501 / Details

Six joints where a house succeeds or leaks.

Most failures in a house, new or decades old, start at a transition, not in the middle of a wall. Hover or tap a joint below to see what meets there, how it tends to fail, and what to ask any builder about it.

Detail 01 / A-501

Window head in stone

What meets here
The top of the window frame, its head flashing, the lintel that carries the stone above, and the drainage space behind the veneer.
Where it fails
Water that gets behind stone runs down the drainage space. If nothing at the window head turns it outward, it lands on top of the frame and finds a way into the wall.

Ask your builderHow is the window head flashed, and where does water behind the stone leave the wall?

Detail 02 / A-501

Stone veneer at grade

What meets here
The bottom course of stone, the weep path at its base, the foundation, and the finished grade or paving next to it.
Where it fails
When stone runs down into soil or mulch, the weep path clogs and moisture wicks upward. Veneer needs clearance above grade, set by the manufacturer and the building code.

Ask your builderWhat clearance does the stone keep above finished grade and paving?

Detail 03 / A-501

Roof edge meeting a wall

What meets here
A lower roof dying into a taller wall: the roof covering, step flashing along the intersection, and the wall cladding.
Where it fails
At the bottom of that intersection, water sheeting off the roof pours straight down the face of the wall. A kickout flashing turns it out onto the roof and into the gutter.

Ask your builderWhere are the kickout flashings, and what happens to the water after them?

Detail 04 / A-501

Deck ledger meeting the house

What meets here
The ledger board carrying the deck joists, the house rim behind it, the flashing over it, and the fasteners between them.
Where it fails
Water trapped behind a ledger rots the rim of the house, out of sight. Ledger connections are a well-known weak point in deck construction when flashing or fastening is skimped.

Ask your builderHow is the ledger flashed and fastened to the house structure?

Detail 05 / A-501

Timber meeting stone

What meets here
The line where wood cladding above stops and stone below begins, with a transition flashing and the drainage layers behind both.
Where it fails
Wood swells and shrinks with moisture, and stone barely moves. A tight, unflashed butt joint opens up, stains, and lets water behind both materials.

Ask your builderWhat happens at the line where one cladding changes to another?

Detail 06 / A-501

Chimney through a roof

What meets here
A masonry chimney passing through the roof: roofing, step flashing, counterflashing set into the masonry, and a cricket on the uphill side.
Where it fails
Snow and water pile up against the uphill face of a chimney. Without a cricket to split the flow, and two-part flashing that lets roof and masonry move separately, the joint leaks.

Ask your builderIs there a cricket behind the chimney, and how is the counterflashing set into the masonry?

Sheet
A-501
Joints
06
Revision
A
Applies to
All work
Showing
Index

Window head Stone at grade Roof into wall Deck ledger Timber to stone Chimney

A-501 / Typical exterior joints

Photos are illustrative images of each joint type, not Master Builders of Colorado projects.

Read the full guide to construction details

On a build: Stone veneer. Illustrative image.

Sheet A-301

What sits behind the stone.

A stone-clad wall is six layers doing six different jobs. Scroll and the assembly comes apart one layer at a time.

A typical assembly for illustration, not a specification.
  1. 01

    Stone veneer

    The face of the wall. Stone sheds most rain, but not all of it, so it is never treated as the waterproof layer.

  2. 02

    Drainage gap

    A narrow space or drainage mat behind the stone gives water that gets through a clear path down and out at the base.

  3. 03

    Water-resistive barrier

    The real rain line. Sheets are lapped like shingles, upper over lower, so water always runs over a seam and never behind it.

  4. 04

    Sheathing

    Panels fastened to the frame. They stiffen the wall against wind and give the barrier a continuous surface to sit on.

  5. 05

    Framing and insulation

    Studs carry the floors and roof. The cavities hold insulation, and the energy code adopted by the local building department sets the minimum.

  6. 06

    Interior finish

    Drywall or plaster. The only layer anyone touches, and the one that shows movement in the frame as cracks when joints are not planned for it.

Sheet A-101

The same house, from frame to finish.

Most of a home's quality is decided before anyone sees a finish, on a new build or a remodel. Drag through the build to see what ends up behind the walls.

A two-story house in timber framing on a neighborhood lot, behind a construction fence along the sidewalkThe same house sheathed, wrapped in house wrap, roofed and fitted with windowsThe same house finished in stacked limestone and cedar siding, with a planted front yard between its neighbors
  1. Framed. The structure, sheathing and openings. Wall layouts, window sizes and blocking for future fixtures are cheapest to change now.
  2. Dried in. Roof, windows and weather barrier are on, so the house is closed to the weather while plumbing, wiring and ductwork go in.
  3. Finished. Stone, timber, trim and landscape. Everything visible now relies on how well the hidden layers were done.

Illustrative images of one house at three stages, not a Master Builders of Colorado project.

Sheet A-102

Before and after, room by room.

Much of the work is on houses that already stand. Drag across the photo to see a dated room become the same room remodeled.

A dated kitchen with honey oak cabinets, laminate counters and a small peninsula
The same kitchen remodeled with white oak cabinets, a stone island and black-framed windows
A dated bathroom with a fiberglass tub surround and an oak vanity
The same bathroom remodeled with a curbless stone shower and a floating oak vanity
An unfinished basement with a concrete floor, exposed joists and bare foundation walls
The same basement finished as a family room with an oak media wall and a large window
A dated living room closed off from the dining room by a wall, with carpet and a brick fireplace
The same space renovated into one open room under a steel beam, with oak floors and a plaster fireplace
A small weathered deck and patchy lawn in a fenced backyard
The same backyard with a covered deck, an outdoor fireplace and cable railings

A closed-in 1990s kitchen becomes a layout built around an island, with new cabinetry, stone counters and black-framed windows.

Kitchen remodels

A tub with a fiberglass surround becomes a curbless stone shower, with the waterproofing that matters most hidden behind the tile.

Bathroom remodels

Bare concrete and open joists become a finished family room, starting with a dry foundation and a proper egress window.

Basement finishing

A wall comes out, a steel beam takes the load, and a closed-in living and dining room becomes one open space.

Whole-home renovation

A small weathered deck becomes a covered outdoor room with a fireplace, framed and flashed into the house.

Decks and outdoor living

Illustrative images of the same room before and after, not Master Builders of Colorado projects.

Sheet G-003

Guides for planning a build or remodel in Colorado.

Three short guides that cover the decisions most people only learn about halfway through a build.

A window head in stone veneer with a steel lintel and a metal head flashingGuide 01 / G-003

Guide 01

Six joints where a house succeeds or leaks

Most leaks start at a transition. What meets at six common joints, how each one fails, and what to ask about it.

Inside this guide

  1. 01Window head in stone
  2. 02Stone veneer at grade
  3. 03Roof edge meeting a wall
  4. 04Deck ledger meeting the house
  5. 05Timber meeting stone
  6. 06Chimney through a roof
Read the guide
Stone veneer going up over metal lath and scratch coatGuide 02 / G-003

Guide 02

What sits behind a stone wall

Six layers, six jobs. Why the stone is never the waterproof layer, and what is.

Inside this guide

  1. 01Stone veneer
  2. 02Drainage gap
  3. 03Water-resistive barrier
  4. 04Sheathing
  5. 05Framing and insulation
  6. 06Interior finish
Read the guide
A floor plan, tape measure, photos and material samples on the table of an older kitchenGuide 03 / G-003

Guide 03

What to bring to a first conversation

You do not need drawings to begin. Seven things that make a first meeting about a build or remodel go further.

Inside this guide

  1. 01The address and any survey
  2. 02Existing drawings and photos
  3. 03Pictures you have been saving
  4. 04What does not work today
  5. 05HOA rules
  6. 06Known problems
  7. 07Budget range and timing
Read the guide

Photos are illustrative, not Master Builders of Colorado projects.

Sheet G-002

Questions to settle before you build or remodel.

10 of 10 questions

LandDo I need to own land before talking to a custom home builder?

No. Many people start the conversation before they buy, and it can save money. A builder can point out slope, soil, access and utility questions that change what a lot will cost to build on.

SoilsWhat is a soils report, and why does it matter in Colorado?

A soils report, also called a geotechnical report, is an engineer's study of what sits under the lot. Parts of Colorado have expansive clay that swells when wet, and the report's findings drive the foundation design. Many building departments require one before they issue a permit.

ContractsWhat is the difference between a fixed-price and a cost-plus contract?

A fixed-price contract sets one sum before construction starts, and the builder absorbs most overruns. A cost-plus contract bills actual costs plus a fee, so the owner sees every invoice and carries the risk of costs rising. A guaranteed maximum price adds a ceiling to cost-plus.

ContractsWhat is an allowance in a building contract?

An allowance is a placeholder budget for something chosen later, such as tile, lighting or appliances. If the final selection costs more, the owner pays the difference. Comparing allowances line by line is one of the most useful things you can do with competing bids.

ContractsWhat is a change order?

A change order is a written amendment that adjusts the scope, price or schedule after the contract is signed. It is how a change of mind during the build gets priced and agreed before the work happens.

RemodelsDoes a remodel in Colorado need a permit?

Most work that changes structure, plumbing, electrical or mechanical systems needs a permit from the local building department, while purely cosmetic work such as paint usually does not. Requirements vary by city and county, so it is worth confirming before work starts.

RemodelsCan an addition and a remodel happen at the same time?

Yes, and it often makes sense. Combining them means the new structure, the openings into the existing house and the finishes on both sides are planned once, with one permit process and one sequence of trades.

TermsWhat does it mean when a house is dried in?

A house is dried in once the roof, windows, exterior doors and weather barrier are installed. From that point, interior work can carry on whatever the weather is doing.

TermsWhat is a certificate of occupancy?

It is the document a building department issues after the final inspection, confirming the house can be lived in. You cannot legally move in without one.

DetailsWhat is flashing, and why does it matter so much?

Flashing is a thin, formed piece of metal or membrane that directs water away from a joint, such as a window head, a roof-to-wall intersection or a deck ledger. Many leaks, in new and older houses alike, trace back to a flashing that was missing, reversed or cut short.

Background: illustrative image of a remodel in progress, not a Master Builders of Colorado project.

Tell us about your project.

A new home, a remodel, an addition, an outdoor space or a repair. Two quick answers help the first conversation start in the right place. Nothing is sent until you continue.

What kind of project?
Where are you?